If your crane runway has been approved for the proposed wheel loads and you have an erector in Vietnam, compare a factory-direct equipment bid plus local installation with an installed bid. If the runway design or installation is still open, shortlist a bidder that can coordinate the crane, runway, power connection and site inspection through handover. Use the same lifting requirements and handover point for both offers.

For an early budget, five published 2026 prices for 5-ton single-girder cranes range from VND 170 million to VND 230 million per set before VAT. Use the dimensions below to pick a reference, then compare what each bidder will deliver. Henan Mine Crane manufactures in China and supplies crane equipment for projects in Vietnam.

Who should lead your crane project?

Pick the lead bidder based on the work your factory can already manage. The runway is the pair of rails and supporting structure on which the crane travels. A crane supplier provides wheel loads and rail requirements so the building engineer can review that structure.

Your factory situation Bid to request Evidence to compare
The new bay's runway design is still open A coordinated equipment and installation offer with a named site contractor The rail and wheel-load drawings, the party approving the runway structure and the party coordinating handover
The runway is ready and a local erector is available Factory-direct equipment plus priced local work, alongside an installed offer The named delivery point, unloading and erection scope, and who resolves fit or wiring issues between contractors
Replacement must fit a planned shutdown A field survey and a dated changeover plan The rail survey, old-crane removal, temporary access, erection, testing and inspection dates

Before shortlisting, match the company named on the quote to the company responsible for the warranty. If one bidder delegates erection, ask who corrects a fit problem and who supplies parts or labour under the warranty. Put those names and responsibilities in the purchase order so a site issue has a clear owner.

Which overhead crane should you ask suppliers to quote?

Send the maximum suspended load, including slings and lifting attachments. Give each bidder the rail-centre span, required high and low hook positions, pickup and set-down points, and your typical loads, lifts per hour and shifts per day. Request a general arrangement drawing showing where the hook can reach and how high it can lift. Compare the proposed maximum wheel loads with the runway design or survey. Assess an existing runway before reusing it.

Lifting requirement Configuration to quote What decides whether it stays on the shortlist
Routine loading or assembly in a bay with adequate clearance Single Girder Overhead Crane with Electric Hoist The hook serves both workstations, the hoist suits your work cycles, and the runway can carry the offered wheel loads.
A single-girder crane fits the duty, but the standard hoist sits too low Low-Headroom Single-Girder Overhead Crane Check whether the compact arrangement gains enough usable hook height while preserving overhead clearance and access to each workstation.
You need more usable lift height or a different trolley arrangement for your duty LH Double Girder Overhead Crane with Electric Hoist Compare the trolley profile, available hook travel, maintenance access and wheel loads against the single-girder offer. Review a winch-trolley design if the hoist trolley cannot meet the stated duty.

Keep a bid on the shortlist only if the drawing shows the hook reaching the required position at each workstation. For example, if the proposed hook stops short of a welding fixture, request a layout with a better hook approach or move the fixture on the bay plan. Fix that coverage issue before comparing equipment prices.

How much does a 5-ton overhead crane cost in Vietnam in 2026?

A Vietnamese supplier's single-girder price list, updated September 24, 2026, gives the following reference prices. Each row is for one 5-ton set. The list leaves delivery and installation unitemised.

Rail-centre span Lift height Bridge travel Published price per set before VAT
8 m 6 m 25 m VND 170 million
10 m 6 m 40 m VND 187 million
11 m 6 m 30 m VND 200 million
14.5 m 6 m 30 m VND 213.5 million
20 m 6 m 66 m VND 230 million

At 6 m lift and 30 m bridge travel, the 14.5 m configuration is listed VND 13.5 million higher than the 11 m configuration. Use the row closest to your measured rail span as a budget reference. The difference applies to those two listed configurations. A firm bid should state the actual hoist, controls and supply scope.

A separate Vietnamese supplier's 2026 budget guide lists VND 280–380 million for 5-ton single-girder cranes at 12–18 m spans and VND 420–650 million for 5-ton double-girder cranes at 18–32 m spans. Its stated scope starts at the rails and excludes runway support beams and building reinforcement. The guide leaves lift height, bridge travel and VAT unspecified. Use the ranges to budget for the indicated layouts and ask each bidder to itemise what the project needs below rail level. See how configuration affects a 5-ton crane equipment quote.

How do you compare equipment and installed quotes?

Give both bidders a common drawing revision, duty, delivery address and handover point. For an initial comparison, the 14.5 m row above is a ready-made example of a dimensioned bid request. Replace its dimensions with the ones measured at your site. Ask the two bidders to return the drawing, wheel loads and line-item scope before you compare totals.

Cost line What to check
Crane and factory tests Bridge, hoist, end carriages, drives, controls and agreed test records
Freight and import charges Named delivery point, applicable Incoterms® rule, insurance, broker fees, duty and VAT treatment
Inland delivery and unloading Transport from the delivery point, access to the bay and unloading equipment
Runway support steel Support beams, brackets, reinforcement and structural approval
Crane travel rails Rail sections, clips, stops and installation
Power feed and site wiring Runway power feed, isolation and connections to the factory supply
Removal and temporary site works Removal of the old crane where applicable, disposal and any temporary work platforms
Erection and commissioning Assembly, installation, alignment and commissioning
Test weights and site inspection Test weights, inspection coordination and handover records

Treat a supplier's excluded item as a project cost if your factory still needs it. For example, when the installed offer includes runway power and the equipment supplier excludes it, enter the local electrician's price in the factory-direct column. Convert foreign-currency amounts to VND using one dated exchange rate and compare before VAT. Review payment terms and delivery schedules separately. Check shipment documents and import responsibilities.

Compare both offers in VND

Enter whole VND amounts before VAT for each option, including work you would buy separately. Mark bundled costs as included elsewhere and select the priced line that covers them.

Compare each offer using the cost lines above. Add the cost of any separately purchased work to the supplier's total.

What should be ready for inspection and handover in Vietnam?

Put local inspection on the installation schedule and name the party coordinating it before you sign the order. Vietnam's QCVN 30:2016/BLĐTBXH addresses occupational safety for overhead and gantry cranes. The published QTKĐ 09-2016/BLĐTBXH procedure covers initial, periodic and extraordinary safety inspections for bridge-type lifting equipment. Confirm the requirements and applicable documents with the inspection organisation for your site.

  • Before fabrication, agree who issues the general arrangement, electrical schematics and operating and maintenance manuals, and which documents need Vietnamese versions.
  • Before shipment, collect the agreed factory test records and match their equipment identification to the supplied crane.
  • After erection and before first use, have the site coordinator prepare the installation records and test weights, arrange initial inspection and allow time to close any findings before releasing the crane to production.

Vietnam project record for a 14-unit first shipment

On May 15, 2026, Henan Mine Crane dispatched the first batch of 14 lifting equipment units for a project in Vietnam. The dispatch photograph shows wrapped equipment loaded on flatbed trucks. View the dated Vietnam shipment record.

For an order that ships in batches, put the equipment ID, destination bay and shipment number on the packing list. Then match them to the erection schedule. A bay may have its bridge on site while the hoist or controls are due in a later batch. Schedule that bay's erection against the last required arrival and confirm inspection dates against the installation sequence.

Flatbed trucks carrying wrapped lifting equipment for a Henan Mine Crane shipment to Vietnam
Henan Mine Crane dispatched its first batch of 14 lifting equipment units for a Vietnam project on May 15, 2026.

To get a crane layout and quote scoped to your Vietnam project, give us your province or industrial park, maximum suspended load, rail span and required hook height. If you have a bay drawing, send it to info@hnksglobal.com so we can assess the lifting layout and site work. Request an overhead crane quote.

Frequently asked questions

Can I get a budget before the factory drawings are finished?

Yes. Send the estimated span, hook height, load and duty. Ask the bidder to list the assumed dimensions and included site work. Update the price after the building drawings confirm the runway and clearances.

Can I reuse the existing crane rails?

Reuse is possible after a survey confirms rail condition and geometry, and a structural review confirms that the proposed crane's wheel loads and spacing suit the runway. Send the rail section and support drawings with the survey.

What electrical details go in the crane enquiry?

Give your supply voltage, frequency and connection point. Ask for the crane's electrical loads and a drawing showing where the crane wiring connects to the plant supply.

Which spare parts should I order with the crane?

Start with parts that can stop production and take longest to obtain for the crane as quoted. Ask for component models, spare part numbers, lead times and any settings files needed for replacement.

share:

Hi there,I’m the Sales Manager at Henan Mine Crane.

For over 20 years, we’ve been helping customers with complete crane solutions and full life-cycle service. If you have any questions , feel free to reach out anytime. We’ll be glad to help and get back to you immediately!



    Directly state your needs and receive professional advice!

    30 Years of Lifting R&D, Following Strict European Standards, Intelligent Empowerment for Heavy Loads, Providing Global Safe & Excellent Solutions


      Get your customized solution
      Contact us today by email at info@hnksglobal.com or fill out the form below.



        X