|
Henan Mine Crane · Paper Mill & Converting Mechanical Gripper Cranes for Paper Roll HandlingTransfer and stack upright paper rolls with a mechanical gripper sized for your roll diameters, grades and storage layout. Henan Mine Crane supplies the bridge, hoist and controls as a package with a matched roll gripper, or reviews the integration of a gripper you already use. |
![]() |
Paper Roll Transfer And Stacking
A mechanical paper roll gripper uses contact pads to grip an upright roll around its circumference. It transfers rolls between wrapping lines, storage stacks and dispatch stations.
| Transfer point | Typical crane task |
|---|---|
| Wrapping line discharge | Pick up upright rolls from a transfer station and place them in the warehouse buffer. |
| Roll warehouse | Stack and retrieve approved roll sizes with room for the open jaws between adjacent rolls. |
| Dispatch and converting | Deliver rolls to a staging station. Where the next operation needs a horizontal roll, specify a separate turning function or upender. |
What Henan Mine Crane Supplies
A Matched Crane And Gripper
We size the hoist for the roll and attachment together and match the gripper pads to the roll diameter, grade and wrapping. The arrangement drawing shows hook height, jaw clearance and coverage at each pickup and set-down point.
Controls For Roll Placement
Radio and variable speed controls are available for operator-led transfer. Programmed systems can add position feedback, sway control and conveyor signals, with grip confirmation before travel and interlocked release once the roll is supported.
Documents For The Building And Line Integrator
The proposal identifies wheel loads, runway and power interfaces, attachment drawings and the agreed inspection plan. It separates equipment supply from installation, commissioning, training and spare parts so quotations can be compared on the same scope.
Technical Configuration
| Item | Selection basis |
|---|---|
| Crane rating | Bridge and hoist sized for the maximum suspended weight, including the roll, gripper and any adapter or rigging. |
| Gripper range | Roll mass, diameter and width limits; grade, wrapping and contact pads. Check the minimum roll weight where the mechanism depends on the load to grip. |
| Span and usable lift | Sized around runway centres, the open gripper envelope, the highest stack and transfer station levels. |
| Working duty | Selected from rolls per hour, travel distance, load spectrum and shifts. Include pickup, positioning, release and return in the cycle. |
| Plant interfaces | Supply voltage, guarded travel areas, conveyor signals and recovery after an interruption as specified for the project. |
Selection Considerations
Use the heaviest roll to size the crane. Check the lightest, softest and most slippery rolls when selecting the gripper. Wrapped and unwrapped rolls can behave differently at the pads. Check the open jaws at the tightest stack position before fixing the warehouse layout.
Mechanical Gripper vs. Other Roll Lifting Configurations
| Lifting configuration | When to specify it |
|---|---|
| Mechanical gripper on a double-girder bridge | Repeated upright transfer and stacking. The circumference must accept pad pressure, and adjacent rolls must leave room for the jaws. |
| End-face vacuum lifter | Upright handling where the roll end forms a reliable seal. Verify face condition, porosity and retention on loss of power. |
| Core lifter on a compact bridge crane | Where the core is rated for lifting and the approach permits insertion. Confirm the core dimensions, strength and load orientation. |
| Lifting beam with a multi-trolley bridge | Shaft-supported reels or machine rolls with approved lifting points. Specify the load on each hoist and the coordinated lift sequence. |
Example: A 5 t paper roll, a 1.2 t gripper and a 0.3 t adapter put 6.5 t on the hoist. Check the crane rating against that total and the gripper rating against the roll. Final selection also depends on the operating duty and clearances.
Paper Roll Gripper Crane Price
A 5–10 t specialty paper mill crane has a planning benchmark of US$20,000–50,000. Use that range for preliminary budgeting; the mechanical gripper and line controls vary by project.
| Reference configuration | Indicative equipment budget |
|---|---|
| Standard 5 t single-girder, 10–22 m span | US$5,000–12,000 per unit, factory equipment |
| Standard 10 t double-girder, 10–28 m span | US$15,000–32,000 per unit, factory equipment |
| Specialty 5–10 t paper mill crane | US$20,000–50,000 market reference; attachment and service scope vary |
The project quote itemizes the bridge and hoist, gripper, controls and conveyor interface. Allow separately for runway steel, freight, duties and installation unless included. See the overhead crane cost guide for equipment and site costs.
Paper Mill Reference: Puyang Longfeng Paper
Henan Mine Crane equipment in the mill’s 2026 maintenance scope includes a 20 t overhead crane in the paper production centre’s turbine room and a 32/5 t bridge crane with a 16.5 m span in the pulp centre. Finished-roll storage is a separate application with its own gripper, clearances and cycle requirements.
Testing And Service Support
Factory and site tests can cover crane motions, grip confirmation, set-down and release, and the response to a lost signal or power interruption. Handling trials with representative rolls check grip, pad marks and cycle time before acceptance.
Installation guidance, commissioning and operator training can be included. Service packages can cover spare contact pads, pins and bushings, with inspection points and replacement criteria for the selected gripper.
Frequently Asked Questions
Can one mechanical gripper handle different paper grades?
Yes, within its approved roll range. Validate the pads and gripping force for each grade and wrapping condition, including soft tissue or easily marked rolls.
Can a roll gripper be fitted to an existing overhead crane?
Yes, if the crane has sufficient capacity, duty and clearance for the combined load and the attachment can be integrated with its controls. We review the hook interface and runway loads before quoting.
Can the crane turn an upright roll to horizontal?
A vertical stacking gripper handles the roll in its rated orientation. Turning requires an attachment or upender approved for that roll and movement.



