Double-girder bridge crane
Parameters of LH Double-Girder Bridge Cranes Manufactured by Henan Mine
| Core Components | Bearing, Gearbox, Motor, Pump |
| Place of Origin | Henan, China |
| Warranty | 1 Year |
| Weight (KG) | 2000 kg |
| Video outgoing-inspection | Provided |
| Machinery Test Report | Provided |
| Design | Double beam |
| Effectiveness | high efficiency |
| Operating speed | High speed operation |
I. Product Introduction of Henan Mine Double-girder Electric Hoist Bridge Crane
I. Product Introduction of Henan Mine LH Double-Girder Bridge Crane
The Henan Mine LH Double-Girder Bridge Crane is a classic model specifically designed for medium-to-heavy-duty lifting applications. Its core design combines a “dual main girder load-bearing structure with an electric hoist lifting mechanism,” offering lifting capacities ranging from 5 to 50 tons and spans from 8 to 35 meters. It is suitable for diverse complex operating conditions, including standard temperature, high temperature, explosion-proof, and corrosion-resistant environments. This equipment combines the heavy-load stability of double-girder cranes with the operational flexibility of electric hoists. It addresses the insufficient heavy-load capacity of single-girder cranes while offering greater portability and cost-effectiveness compared to traditional double-girder hook cranes. Widely used in machinery manufacturing, metallurgy, power generation, building materials, and other industries, it provides a solid foundation for enterprises to achieve efficient and safe medium-to-heavy load handling.

Henan Mine’s Clean Explosion-Proof Crane
Robust double-girder structure with superior heavy-load performance
- Main girders utilize Q355B high-strength steel, formed through CNC plasma cutting and automated submerged arc welding. The entire structure undergoes shot blasting rust removal, with weld quality meeting GB/T 12469-2019 Grade 1 standards. It exhibits strong bending and torsional resistance, maintaining deformation-free operation under 50t heavy-load conditions.
- The box-type dual-girder design ensures even stress distribution and a large load-bearing area. Paired with reinforced end beams and high-rigidity wheel assemblies, it achieves 60% greater operational stability than single-girder cranes, minimizes start/stop impact, and effectively prevents damage from heavy-load collisions.
- Critical load-bearing components undergo quenching and tempering heat treatment, achieving fatigue strength exceeding 10⁷ cycles. Designed for a 20-year service life, it significantly surpasses industry averages, reducing equipment replacement frequency and investment costs.

Electric Hoist Configuration for Flexible and Efficient Operation
- Equipped with Henan Mine’s independently developed CD/MD electric hoist, offering dual-speed lifting adjustment from 0.8 to 8 m/min. High-speed operation enhances transfer efficiency under light loads, while low-speed, stable lifting ensures safety during heavy-load operations.
- The hoist features an integrated design with compact structure and easy installation. Paired with a wireless remote controller, it enables remote operation within a 100-meter range with ±3mm precision, meeting demands for heavy-duty component assembly and precise material handling.
- Core components—motor, reducer, and drum—are in-house manufactured. After 1200+ hours of fatigue testing, failure rates are reduced by 70% compared to industry averages, lowering maintenance costs.
.
Full-scenario adaptability with ample safety redundancy
- Customized for diverse conditions: Tailored models include high-temperature (withstands radiant heat over 800°C), explosion-proof (ExdⅡBT4/ExdⅡCT4 rated), corrosion-resistant (suitable for acidic/alkaline or high-humidity environments), and low-headroom (for facilities under 4.5m ceiling height);
- Multi-layered Safety Protection: Standard features include overload protection, off-center load warning, travel limit switches, collision prevention, and emergency braking. Real-time monitoring of operational status triggers automatic shutdown and alerts during anomalies. Equipped with an emergency power system, it ensures smooth braking during sudden power outages to prevent material drop.
- Comprehensive Compliance Certifications: Products hold National Special Equipment Manufacturing License (Class A) and Installation/Modification/Maintenance License, comply with GB/T 14405-2011, GB 6067, and other national standards, ensuring smooth acceptance by special equipment inspection institutes and industry safety audits.
Core Technical Advantages: Henan Mine's Exclusive Competitive Edge
- Outstanding Cost-Effectiveness: Compared to traditional double-girder hook cranes, it features a lighter structure and lower manufacturing costs while retaining the heavy-load capacity of double-girder designs, saving enterprises with medium-to-heavy load requirements over 30% in procurement costs;
- Energy Efficiency & Reduced Consumption: Electric hoists equipped with YE4 ultra-high-efficiency motors achieve over 30% energy savings compared to conventional motors; Optimized transmission design achieves 96% efficiency, further reducing operational energy consumption.
- Rapid Customization & Delivery: Operating Asia’s largest single crane production facility with over 600 automated machines, standard models ship within 15-20 days while customized units are delivered in 30-45 days, meeting urgent production demands.
- Intelligent Upgrade Adaptability: Supports retrofitting with PLC intelligent control systems, laser positioning, energy consumption monitoring modules, and seamless integration with MES, ERP, and other production management systems. Enables multi-device coordination and real-time data traceability, accelerating enterprise smart manufacturing transformation.
Application Scenarios: Covering Medium-to-Heavy Load Demands Across Multiple Industries
- Machinery Manufacturing: Heavy machine tool assembly, large component processing/transportation, finished engineering machinery warehousing, etc.;
- Metallurgy Industry: Auxiliary material hoisting in steelmaking workshops, billet transfer in continuous casting workshops, equipment maintenance in rolling mills;
- Power Industry: Boiler component maintenance in thermal power plants, auxiliary hoisting for generator units in hydroelectric stations, transformer handling in substations;
- Building Materials Industry: Clinker transfer in cement plants, raw material hoisting in glass factories, block handling in stone processing plants;
- Chemical Industry: Material hoisting in explosion-proof workshops, equipment maintenance in acid/alkali workshops, etc.
- Other Scenarios: Heavy cargo loading/unloading in large warehouses, port piece cargo transfer, heavy equipment installation in municipal projects, etc.
Quality & Service Assurance: Ensuring Seamless Customer Experience
- Stringent Quality Control: Each unit undergoes multiple rounds of testing (no-load, heavy-load, dynamic load) before shipment, accompanied by nationally recognized inspection reports to guarantee product compliance.
- End-to-End Dedicated Service: Free on-site surveys to develop customized solutions based on production rhythms and site conditions; professional teams handle installation and commissioning, assisting with system integration and special inspection institute acceptance;
- Nationwide After-Sales Network: Over 480 service centers across China, staffed by 200+ specialized LH double-girder crane engineers. 24-hour response, on-site within 8 hours for faults, and within 24 hours for remote areas;
- Warranty Commitment: 1-year warranty for the entire machine; 3-year warranty for core components (electric hoist, motor, reducer). Free repair or replacement for non-human-induced damage during warranty period. Annual maintenance agreements available for scheduled on-site specialized maintenance.
Parameters of LH Double-Girder Bridge Cranes Manufactured by Henan Mine
| Capacity | T | 5 | ||||||
| Span | m | 7.5 | 10.5 | 13.5 | 16.5 | 19.5 | 22.5 | 25.5 |
| Lifting height | m | 6/9/12/18/24/30 | ||||||
| Lifting speed | m/min | 8or8(8/0.8) | ||||||
| Trolley travelling speed | m/min | 20 | ||||||
| Crane travelling speed | m/min | 20 | ||||||
| Total weight | kg | 5230 | 6400 | 7450 | 8600 | 10560 | 12350 | 14850 |
| Max. Wheel load | KN | 39 | 43 | 48 | 53 | 59 | 62 | 71 |
| Rail recommended | Model | 38kg/m | ||||||
| Total motor power | kw | 8.3 | ||||||
| Main dimension (mm) | Span(m) | 7.5 | 10.5 | 13.5 | 16.5 | 19.5 | 22.5 | 25.5 |
| Rail top to crane top | H | 1350 | 1550 | |||||
| Rail top to hook center | H4 | 385 | 540 | |||||
| Crane base distance | W | 2700-3100 | 3200-3600 | 3800 | ||||
| Crane width | B | 3200-3900 | 3700-4200 | 5300 | ||||
| Trolley rail distance | K | 1400-1800 | ||||||
| Hook left limitation | S1 | 1200 | 1200 | |||||
| Hook right limitation | S2 | 1200 | 1200 | |||||
| Capacity | T | 10月3日 | ||||||
| Span | m | 7.5 | 10.5 | 13.5 | 16.5 | 19.5 | 22.5 | 25.5 |
| Lifting height | m | 9/12/18/24 | ||||||
| Lifting speed | m/min | 7(7/0.7) or8(8/0.8) | ||||||
| Trolley travelling speed | m/min | 20 | ||||||
| Crane travelling speed | m/min | 20;30 | ||||||
| Total weight | kg | 6240 | 8050 | 9480 | 10450 | 13260 | 16530 | 18620 |
| Max. Wheel load | KN | 65 | 72 | 77 | 80 | 88 | 97 | 102 |
| Rail recommended | Model | 38kg/m | ||||||
| Total motor power | kw | 8.3 | ||||||
| Main dimension (mm) | Span(m) | 7.5 | 10.5 | 13.5 | 16.5 | 19.5 | 22.5 | 25.5 |
| Rail top to crane top | H | 1450 | 1650 | |||||
| Rail top to hook center | H4 | 365 | 565 | |||||
| Crane base distance | W | 3000-4200 | ||||||
| Crane width | B | 3500-5696 | ||||||
| Trolley rail distance | K | 1600-2250 | ||||||
| Hook left limitation | S1 | 1250 | 900 | |||||
| Hook right limitation | S2 | 1400 | 1200 | |||||
| Capacity | T | 3月16日 | ||||||
| Span | m | 7.5 | 10.5 | 13.5 | 16.5 | 19.5 | 22.5 | 25.5 |
| Lifting height | m | 9/12/18/24 | ||||||
| Lifting speed | m/min | 3.5(3.5/0.35) or8(8/0.8) | ||||||
| Trolley travelling speed | m/min | 20 | ||||||
| Crane travelling speed | m/min | 20 | ||||||
| Total weight | kg | 7970 | 8610 | 9990 | 12800 | 15300 | 17540 | 20080 |
| Max. Wheel load | KN | 95 | 102 | 110 | 119 | 127 | 134 | 141 |
| Rail recommended | Model | 38kg/m | ||||||
| Total motor power | kw | 13.8 | ||||||
| Main dimension (mm) | Span(m) | 7.5 | 10.5 | 13.5 | 16.5 | 19.5 | 22.5 | 25.5 |
| Rail top to crane top | H | 1450 | 1650 | |||||
| Rail top to hook center | H4 | -500 | -310 | |||||
| Crane base distance | W | 3000-4200 | ||||||
| Crane width | B | 3500-5696 | ||||||
| Trolley rail distance | K | 1600-2250 | ||||||
| Hook left limitation | S1 | 1240 | 900 | |||||
| Hook right limitation | S2 | 1450 | 1200 | |||||
|
Capacity |
T |
20/5 |
||||||
|
Span |
m |
7.5 |
10.5 |
13.5 |
16.5 |
19.5 |
22.5 |
25.5 |
|
Lifting height |
m |
9/12/18/24 |
||||||
|
Lifting speed |
m/min |
3.5(3.5/0.35) or8(8/0.8) |
||||||
|
Trolley travelling speed |
m/min |
20 |
||||||
|
Crane travelling speed |
m/min |
20 |
||||||
|
Total weight |
kg |
10500 |
11500 |
13640 |
15980 |
17700 |
20300 |
22920 |
|
Max. Wheel load |
KN |
118 |
129 |
135 |
148 |
156 |
164 |
169 |
|
Rail recommended |
Model |
38kg/m |
||||||
|
Total motor power |
kw |
19.3 |
||||||
|
Main dimension (mm) |
Span(m) |
7.5 |
10.5 |
13.5 |
16.5 |
19.5 |
22.5 |
25.5 |
|
Rail top to crane top |
H |
1790 |
||||||
|
Rail top to hook center |
H4 |
-350 |
||||||
|
Crane base distance |
W |
3750-4500 |
||||||
|
Crane width |
B |
4632-5982 |
||||||
|
Trolley rail distance |
K |
1600-2550 |
||||||
|
Hook left limitation |
S1 |
1100 |
||||||
|
Hook right limitation |
S2 |
1100 |
||||||
|
Capacity |
T |
32/10 |
||||||
|
Span |
m |
7.5 |
10.5 |
13.5 |
16.5 |
19.5 |
22.5 |
25.5 |
|
Lifting height |
m |
9/12/16/24 |
||||||
|
Lifting speed |
m/min |
3(3/0.3) or7(7/0.7) |
||||||
|
Trolley travelling speed |
m/min |
20 |
||||||
|
Crane travelling speed |
m/min |
20 |
||||||
|
Total weight |
kg |
12530 |
14660 |
16360 |
18870 |
21650 |
24260 |
27060 |
|
Max. Wheel load |
KN |
167 |
184 |
196 |
206 |
215 |
224 |
233 |
|
Rail recommended |
Model |
43kg/m |
||||||
|
Total motor power |
kw |
20 |
||||||
|
Main dimension (mm) |
Span(m) |
7.5 |
10.5 |
13.5 |
16.5 |
19.5 |
22.5 |
25.5 |
|
Rail top to crane top |
H |
1900 |
||||||
|
Rail top to hook center |
H4 |
-700 |
||||||
|
Crane base distance |
W |
1600-2500 |
||||||
|
Crane width |
B |
5070-5960 |
5572-6222 |
|||||
|
Trolley rail distance |
K |
1600-2550 |
||||||
|
Hook left limitation |
S1 |
1100 |
||||||
|
Hook right limitation |
S2 |
1600 |
||||||
Product Advantages Overview
Details of the Double-girder Electric Hoist Bridge Crane Manufactured by Henan Mine
What industries are the Single-girder bridge crane manufactured by Henan Mine suitable for?
-
Machine Manufacturing & Assembly WorkshopsSuitable for machine tool processing and heavy machinery/automotive component assembly, handling large machine bases, castings, engine assemblies, and machine tool components. For example, in construction machinery plants, it lifts excavator undercarriages and crane booms, integrating with assembly lines to boost efficiency. Its low headroom design fits retrofitted older facilities, while its light weight reduces structural load requirements
-
Metallurgy / Steel Auxiliary WorkshopsUsed in metallurgical plant spare parts warehouses, rolling mill auxiliary zones, and heat treatment workshops for lifting billets, molds, maintenance components, etc. Not suitable for handling molten steel ladles or other high-temperature molten materials, but can perform auxiliary material transfers in non-direct high-temperature zones. Can transport steel workpieces when paired with electromagnetic chucks.
-
Energy & Power Maintenance & AssemblyTurbine rooms in thermal power plants, hydroelectric plant buildings, and substation maintenance bays. Used for lifting generator stators/rotors, hydro turbine components, transformers, high-voltage switchgear, etc. Multiple safety protections support high-precision lifting. Low-clearance design saves space in power plant buildings, meeting periodic equipment maintenance needs. investment cost.
-
Logistics, Warehousing & Yard OperationsHeavy-duty goods warehouses , automated storage centers, and port inland transfer stations. Used for handling and stacking full steel coils and heavy equipment during storage and retrieval. Compatible with shelving systems for high-density storage, maximizing space utilization. Low wheel load suits lightweight warehouse foundations, reducing infrastructure costs.
-
Light Textile / Food / General Industrial WorkshopsReplaces conventional double-girder cranes for handling heavy coils in textile mills, large packaging equipment in food plants, and precast components in building material factories. Supports A3-A5 duty cycles with flexible operation, suitable for general-purpose applications with moderate production rhythms. Strictly prohibited in flammable, explosive, or highly corrosive environments.
-
Construction & Engineering Support SitesSuitable for precast bridge yards, wind turbine assembly plants, and heavy equipment maintenance stations. Handles lifting of precast box girders, tower components, and complete construction machinery. Can integrate with rail systems for large-scale transfers, enabling precise coordination between precast production and loading processes to enhance material turnover efficiency on construction sites.
How to Choose the Best Crane Manufacturer in China
-
1Clarify Your Crane NeedsThoroughly understand your lifting requirements (load details, frequency, and workspace environment) before approaching crane manufacturers.
-
2Determine Crane Service ClassCalculate the required crane service class based on your operational intensity to ensure optimal performance and longevity.
-
3Explore Crane Supplier Custom Features:Investigate available customization options and special features to enhance safety, efficiency, and precision for your specific application.
-
4Assess Crane Factory Engineering CapabilityEvaluate the manufacturer's engineering strength to ensure they can design a suitable solution tailored to your needs.
-
5Verify Quality & Compliance of Crane CompanyCheck the crane manufacturer's manufacturing quality, certifications, and compliance with international standards and your local safety regulations.
-
6Ensure Support & ReferencesConfirm the manufacturer provides reliable after-sales support and has a proven track record with positive references in your industry or region.
Why We Are More Trustworthy
Experienced company
Professional team & equipment
Productive capacity
Customized design services
Why Our Cranes Earn Customers' Trust
The services we provide
Free customization scheme
Regular Maintenance Reminder
Technical support consultation
Free customization scheme
Our Patents and Certifications
Customer Testimonials & Top Choices
Related Product Recommendations
Become our distributor
Common Issues with Electric Single-Girder Cranes
-
. Core Question: Given my site and requirements, what capacity and span should I choose for an electric single-girder crane?Professional Solution: Selecting the right model hinges on 3 core parameters + 1 site condition: ① Maximum Lifting Capacity: Based on the heaviest daily load + 10% margin ② Span: Match the factory column spacing + allow 0.5-1 meter clearance ③ Lifting Height: Match the highest shelf level + add 1 meter safety clearance
-
Safety Concerns: As special equipment, are electric single-girder cranes safe?Expert Solution: This is the fundamental concern for all clients. We address it through two key assurances: ① Compliance Certification: Henan Mine holds the “Special Equipment Manufacturing License” and “Installation, Modification, and Maintenance License” issued by the State Administration for Market Regulation. Each unit comes with a unique product qualification certificate and factory inspection report, fully compliant with the GB/T 14405-2011 national standard. ② Safety Devices: Standard features include overload protection, travel limit switches, emergency brakes, and anti-derailment hooks. Select models can be upgraded with wind speed sensors and remote monitoring systems.
-
Implementation Concerns: How long does installation take? Will it disrupt normal production?Professional Solution: Electric single-girder crane installation is significantly simpler and more efficient than double-girder or gantry cranes: ① Installation Duration: Standard models can be installed within 2-3 days if site conditions meet requirements Custom models or multi-unit coordination projects typically complete within 5-7 days. ② Minimal Production Disruption: We prioritize nighttime, weekend, or downtime installation schedules. Fully enclosed operations prevent damage to factory facilities or production materials.
-
Cost Concerns: Is the energy consumption of electric single-girder cranes high? Are subsequent maintenance costs expensive?Professional Answer: Electric single-girder cranes represent a low-cost, high-value solution. ① Energy Consumption: Our models feature YE3 high-efficiency motors, achieving 25%-30% greater energy savings than traditional motors. ② Maintenance costs: Under normal usage, only 2 routine maintenance checks are required annually. Core components carry 1-3 year warranties. Non-human-induced damage during warranty periods qualifies for free replacements. Our genuine parts pricing is transparent with no intermediary markups, keeping replacement costs low.
-
Operational Concerns: Is the electric single-girder crane easy to operate? Can regular employees learn it quickly?Customer Pain Points: Concerns about complex operation, employees struggling to learn, and worries about needing specialized certifications that increase labor costs. Expert Answer: Electric single-girder crane operation is exceptionally simple, often described as “foolproof”: ① Control Method: Standard ground-level handle buttons control lifting, lowering, and lateral movement. Optional wireless remote control enables operation within 100 meters. Clearly labeled buttons allow new operators to master basic functions within 10 minutes. ③ Safety Protection: Multiple safeguards ensure safety even for inexperienced operators—overload cuts power, track limits prevent derailment, and emergency brakes stop accidental movements.
-
Customization Inquiry: Can you tailor solutions for my unique site conditions?Expert Answer: The core strength of electric single-girder cranes is “flexible customization.” At Henan Mine, 70% of our annual orders are custom-made: ① Low-headroom customization: For workshops ≤4.5 meters high, the main girder uses a flat design. The hook reaches a minimum height of just 2.2 meters above the floor while still achieving 3-4 meters of lifting height. ② Special Environment Customization: Explosion-proof models for chemical/oil workshops; cleanroom models for pharmaceutical/electronics facilities (ISO Class 8 certified); low-temperature models for -25°C cold storage; corrosion-resistant models for coastal/acid-alkali environments. ③ Functional Customization: Optional features include load cell display, variable frequency drive, and smart integration to fully meet your specific requirements.
-
After-Sales Concerns: What if equipment malfunctions? How responsive is support? Do you offer on-site maintenance?Professional Response: We sell not just equipment, but lifetime service assurance: ① Response Speed: With over 300 service centers globally and a 24/7 hotline, our engineers typically arrive within 24 hours—whether in urban or county areas—and reach remote locations within 48 hours.
Operating Manual for Electric Single-Girder Cranes
-
Each crane must display a rated load capacity plate in a conspicuous location.
-
No personnel are permitted on the girder during operation, nor may the hook be used to transport persons
-
Operation is prohibited without a valid operator's license or under the influence of alcohol.
-
Operators must maintain full concentration during operation; talking, smoking, or engaging in unrelated activities is strictly forbidden.
-
Keep the crane clean and tidy; do not store equipment, tools, flammable materials, explosives, or hazardous substances haphazardly.
-
Do not overload the crane.
-
When operating along obstacle-free paths, the hook, lifting device, or bottom surface of the load must remain at least 2 meters above ground level. When crossing obstacles, the load must clear the obstacle by at least 0.5 meters
-
For loads under 50% of rated capacity, both lifting mechanisms may operate simultaneously. For loads exceeding 50% of rated capacity, only one mechanism may operate.
-
.For bridge cranes equipped with main and auxiliary hooks, do not simultaneously raise or lower both hooks (except under special circumstances).
-
Welding or hammering on suspended loads, or working beneath suspended loads, is prohibited (except when properly supported).
-
Inspection or maintenance work may only be performed after power has been disconnected and a “Do Not Operate” sign is displayed on the power switch. If live work is unavoidable, implement safety measures and assign dedicated supervision.
-
Do not throw objects from the vehicle indiscriminately.
-
Regularly inspect limit switches and interlock protection devices.
-
Do not use limit switch impact as a stopping method.
-
Do not lift or lower loads when hoist brakes malfunction.
-
Do not operate the hoist above personnel or equipment.
-
When welding any part of the crane, use a dedicated ground wire; do not use the crane body as a ground.
-
When the hook is at its lowest position, ensure at least two full turns of safety rope remain on the drum.
-
Cranes must not collide with each other; using one crane to push another into operation is strictly prohibited.
-
When lifting heavy objects, molten metal, explosives, or hazardous materials, first slowly raise the load 100–200 mm off the ground to test brake reliability.
-
Maintenance and inspection lighting must operate at voltages below 36V.
-
All electrical equipment enclosures on bridge cranes must be grounded. If trolley rails are not welded to the main girder, grounding measures must be implemented. Grounding conductors may use galvanized flat iron with a cross-sectional area exceeding 75mm², bare copper wire of 10mm², or galvanized round steel exceeding 30mm². The operator's cab or crane body shall have more than two grounding points. The grounding resistance from any point on the crane to the power supply neutral point shall be less than 4Ω.
Directly state your needs and receive professional advice!
The project was delivered on time and landed safely
Improve efficiency
Avoiding risks