CORE & COIL ASSEMBLY · TANKING · FINISHED TRANSFORMER HANDLING

Transformer Handling Cranes for Assembly, Tanking & Loading

Move transformer components through assembly, lower active parts into tanks and load finished units with a crane matched to each stage of production.

Established in 2002, Henan Mine Crane supplies overhead and gantry crane packages for transformer manufacturing and repair workshops. Your package brings together the crane, a checked lifting envelope, selected motion controls and the documents needed for installation and acceptance. Equipment, process options and site services are itemized in the quotation.


Get a Transformer Crane Proposal


Compare Crane Configurations

Henan Mine Crane double-trolley overhead crane with two separate electric-hoist lifting positions
Double-trolley crane platform. Capacity, hook spacing and coordinated operation are engineered for the component and its approved lifting points.

A Defined Crane Package for Your Transformer Workshop

Engineering that reaches the tanking position

We develop the load schedule, hook arrangement and working envelope together. Your layout shows whether the active part clears the tank rim, where the hook can travel and how the finished transformer reaches the loading position.

Controls selected for the actual operation

Heavy transfer, final lowering and two-point handling receive the motion functions they need. The technical offer identifies the selected approach speed, control modes, feedback and acceptance criteria.

One coordinated workshop proposal

We coordinate heavy tanking cranes, smaller assembly cranes and loading equipment within the same factory layout. Common controls, component choices and spare-parts identification can be standardized where the duties permit.

Supply level Equipment and deliverables Quotation treatment
Base crane package Bridge or gantry structure, end carriages, trolley, lifting mechanism, hook and rope system, drives, electrical controls, brakes, limits and specified load protection. Capacity, span, lift, duty, speeds, control method and electrical supply are listed for the offered crane.
Transformer process options Lifting beam or attachment, selected low-speed lowering, coordinated hoists, feedback, anti-sway, debris guards, lubrication containment and station interlocks. Each selected option is identified with its function, supply boundary and acceptance requirement.
Runway and power-feed equipment Rails, runway components, conductor systems or festoons and crane-to-building electrical interfaces. Included items, quantities and interface limits are stated separately.
Site and operating services Installation guidance, commissioning assistance, operator training and recommended spare parts. Location, service scope, travel arrangements and site responsibilities are stated in the commercial offer.

What this gives your purchasing team: a crane schedule and scope breakdown that can be compared with the building design, transformer process and competing quotations.

75/20 t and 100/20 t Overhead Crane Specifications

The QD configurations below are published in the Henan Mine Crane Product Selection Guide. They provide specific base-platform data for planning heavier transformer handling. The final application specification also includes the lifting gear, tanking clearance and selected process controls.

Parameter QD 75/20 t · A5 QD 100/20 t · A5 QD 100/20 t · A6
Main / auxiliary rating — t 75 / 20 100 / 20 100 / 20
Span of the listed configuration — m 22.5 22 22
Main-hook maximum lifting height — m 20 22 22
Auxiliary-hook maximum lifting height — m 22 22 22
Crane working class A5 A5 A6
Main hoisting speed — m/min 6.1 3.9 4.9
Auxiliary hoisting speed — m/min 7.2 7.2 7.2
Trolley travel speed — m/min 38.4 33.86 33.86
Bridge travel speed — m/min 65 65.7 65.7
Catalogue maximum wheel load — kN 309 378 387
Recommended rail in the catalogue QU100 QU100 QU100
Catalogue electrical supply 380 V · 50 Hz · 3-phase 380 V · 50 Hz · 3-phase 380 V · 50 Hz · 3-phase

Span choices in these catalogue families: 75/20 t: 13.5, 16.5, 19.5, 22.5, 25.5, 28.5 and 31.5 m; 100/20 t: 13, 16, 19, 22, 25, 28 and 31 m.

The published hoisting speeds are catalogue operating speeds. The required loaded approach speed for tanking is selected separately. Wheel loads above apply to the shown catalogue configurations; the final crane reactions are issued for the building and runway design. Source: Product Selection Guide, printed pages 42 and 44.

Transformer Handling from Core Assembly to Dispatch

A transformer handling crane lifts and transfers transformer components or complete units during manufacture, repair and loading. The load changes as the transformer is assembled, so one nameplate weight does not describe every lifting operation.

Operation Our crane arrangement What it provides
Core and coil assembly Overhead lifting with a beam or attachment matched to the assembly fixture. Access to the designated lifting points while keeping rigging clear of windings, leads and insulation.
Active-part tanking and untanking Overhead crane with selected loaded approach speed and suitable hook height. Vertical coverage from the assembly stand to the tanking position, including clearance above the tank opening.
Tank, cover and accessory handling Separately rated main or auxiliary hoist, or a dedicated assembly crane. A lifting arrangement suited to each component without occupying the heavy hoist for every smaller task.
Test-bay transfer Overhead coverage coordinated with test equipment, access zones and parking positions. Movement into and out of the test position under the facility’s de-energized handling procedure.
Finished-transformer loading Overhead or gantry coverage reaching the agreed trailer, rail or transfer position. A defined handover point between factory lifting and onward transport.

Select Capacity, Hook Arrangement and Tanking Clearance

A load schedule for every production stage

We size the crane from the heaviest permitted suspended package in its working area. Active-part, empty-tank, shipping and oil-filled weights are treated as separate lifting cases. The schedule includes the accessories fitted at that stage and the beam, slings and other gear carried below the hook. Transformer kVA or MVA alone does not determine crane capacity.

Illustrative capacity check: an 82 t transformer + a 6 t lifting beam + 2 t of slings and shackles = a 90 t suspended package. A 75 t hoist cannot cover this package. A 100 t main-hoist configuration is a candidate for engineering review; duty, clearances and the complete lifting arrangement still govern the final selection.

A clearance drawing for tanking and untanking

Clearance item What our arrangement drawing establishes
Vertical tanking envelope Active-part height, tank-rim elevation, required clearance above the opening, beam and sling height, and the required upper hook position.
Horizontal approach and transfer Hook coverage over the assembly stand and tank, clearances from columns and equipment, and the travel path between stations.
Building and maintenance space Crane envelope below the roof and services, runway elevation and access to the hoisting and travel equipment.
Dispatch handover Trailer, rail or transfer position, loading height and the hook reach available at that position.

Individual hook loads for two-point handling

We establish lifting-point spacing, centre of gravity, individual hook reactions and permitted operating combinations before choosing the mechanisms. A 100/20 t crane has separately rated main and auxiliary hoists; their ratings are not automatically added. For coordinated lifting, the offer states the operating modes and the specified monitoring and fault response.

Henan Mine Crane double-trolley bridge crane structural arrangement
Double-trolley bridge arrangement. Trolley spacing is checked against the component lifting points and available travel.
Henan Mine Crane double-trolley overhead crane end-view configuration
Crane end-view configuration. Hook position, rigging height and building headroom are checked together for the proposed layout.

Compare Transformer Handling Crane Configurations

Configuration Suitable handling task Configuration basis
Single-girder overhead crane Smaller transformer components, tooling and suitable general assembly work. LDA catalogue family: 1–20 t. Selection also considers duty, headroom and working coverage.
Double-girder overhead crane Active-part handling, tanking and heavier complete transformers. QD catalogue examples include 75/20 t and 100/20 t; higher-capacity families extend to 400/80–450/80 t.
Double-trolley overhead crane Components requiring two separated lifting positions or engineered orientation control. Individual trolley loads, spacing, coordinated operation and acceptable hook-height difference.
Double-girder gantry crane Ground-supported staging, outdoor handling and loading areas. Rail foundations, vehicle clearance, lifting coverage, wind exposure and ground-level access.
Automated overhead handling Repeated movements between defined production or storage stations. Load identification, attachment engagement, positioning, station signals and recovery modes.

Catalogue designations identify available base platforms. The transformer application determines the final span, lift, duty, controls and permitted load combinations.

Transformer Process Options and Their Acceptance

Handling requirement Configuration we offer Delivered verification
Controlled final lowering Hoisting mechanism, drive, brake and feedback arrangement selected for the loaded approach task. Specified speed and stopping behaviour demonstrated under the agreed load and test conditions.
Two-point lifting Separately rated hoists, selected hook spacing, coordinated operating mode and required position or load feedback. Independent and coordinated motions, relative hook-height monitoring and specified fault responses checked during acceptance.
Exposed windings and insulation Selected lubrication containment, debris guards, suitable finishes and access for cleaning. Selected protective provisions identified on the equipment and checked against the technical specification.
Transformer lifting interface Beam or attachment geometry developed around the approved lifting-point drawing. Rated capacity, attachment identification and the agreed attachment documentation supplied within its contracted scope.
Test-bay coordination Parking positions, travel zones and contracted interfaces with the test facility. Zone and interface functions checked with the facility under its approved commissioning procedure.

Transformer lifting points follow the equipment manufacturer’s approved drawing. Tank-cover points are assessed for the load they are designed to carry; radiators, bushings and pipework are not used as substitute lifting points. Cleanroom classification and any hazardous-area requirement are addressed as separate process specifications.

Published Project Evidence in Power-Equipment Handling

Henan Mine Crane: two automated cranes for electrical-material handling

Henan Mine Crane reported a two-crane automation project for box-type substation equipment and power cables in July 2026. The published control arrangement uses VFD and PLC control, hoist encoders and Gray-bus positioning for bridge and trolley travel.

Henan Mine Crane automated electrical-material handling crane with specialized lifting attachment
Henan Mine Crane electrical-material handling project with a specialized attachment and coordinated controls.

The reported functions include 3D scanning, visual inspection, automatic pickup, obstacle avoidance and anti-sway. The attachment uses detection switches, while WCS/WMS integration records material movements. This is a power-equipment logistics reference; transformer tanking loads and clearances are engineered for the separate manufacturing process.

Transformer-factory industry reference: Konecranes for Hitachi Energy

In February 2026, Konecranes announced an order for 24 overhead cranes at Hitachi Energy’s Ludvika transformer factory expansion: 12 S-series and 12 CXT cranes for a new 20,000 m² production building and test hall. Delivery and installation were scheduled for March–September 2026. The announcement identifies VFD motion, positioning controls and debris protection.

This third-party transformer-factory reference shows why production coverage, placement control and cleanliness are considered together in crane planning.

The Drawings, Records and Support Delivered with Your Crane

Project stage Our deliverable How it supports your project
Proposal Recommended crane schedule, load and hook arrangement, preliminary working coverage and itemized equipment and service scope. Your team can compare the crane arrangement with the transformer process and budget.
Technical approval Agreed crane specification, arrangement drawing, wheel reactions, electrical interface information and attachment supply boundary. Building, runway and production-equipment designers work from defined crane interfaces.
Manufacture and inspection Inspection and test plan, agreed inspection records and identification of the supplied major components. The purchasing team can track the contracted inspection and documentation requirements.
Factory and site acceptance Records of the contracted motion, protection and load tests, plus process-function checks for supplied options. Acceptance is based on the functions and conditions stated in the technical agreement.
Handover Operating and maintenance instructions, electrical drawings, parts identification and recommended spare-parts schedule. Operators and maintenance staff receive information tied to the delivered equipment.

Site support: installation guidance, commissioning assistance and operator training are available as separately defined services. The quotation states the site scope, delivery milestones, warranty coverage and service responsibilities. For a multi-crane workshop, we also identify compatible spare parts and common control components where practical.

Transformer Handling Crane Price and Complete Supply Cost

A transformer crane quotation follows the load, span, lift, duty and handling process. The price schedule distinguishes the crane itself from the lifting attachment, process controls, runway equipment and site services.

Public general-crane price references

Published general double-girder configuration Supplier reference price — USD
50 t capacity · 28 m span · 6 m lift US$70,000–120,000
100 t capacity · 32 m span · 6 m lift US$120,000–200,000

Kino Cranes publishes these general references, checked in 2026. They are not prices for the QD configurations listed above or Henan Mine Crane quotations. The source excludes unspecified customization and does not establish an installed price or confirmed EXW/FOB basis. Transformer attachments, controls, cleanliness provisions, freight, taxes and site work must be priced by scope.

Your Henan Mine Crane quotation includes a cost breakdown

Cost item What the quotation identifies
Crane equipment Structure, lifting and travel mechanisms, electrical controls and the selected protection and operating functions.
Transformer process equipment Lifting beam or attachment, selected approach control, coordinated lifting and cleanliness provisions.
Runway and electrical interfaces Rails, runway or support supply where included, electrification and the incoming-power boundary.
Delivery and site services Packing, freight basis, installation guidance, commissioning and training, with included services and exclusions.
Operating support Recommended spares, supplied documentation, warranty terms and agreed service responsibilities.

This breakdown gives the purchasing team a basis for comparing the total supplied scope. Delivery milestones are stated for the selected crane configuration and destination.

Transformer Handling Crane FAQs

What is a transformer handling crane?

A transformer handling crane lifts and transfers transformer components or complete units during manufacturing, repair and loading. Overhead cranes serve production bays, while gantry cranes can serve ground-supported staging or loading areas.

What crane capacity does my transformer need?

Capacity follows the actual suspended package at each handling stage, including the transformer or component, lifting beam, slings and other carried gear. Active-part, shipping and oil-filled weights may differ. kVA or MVA alone does not determine crane capacity.

Can the crane lower a core and coil assembly into its tank?

Yes. The crane can be configured for active-part tanking using the approved lifting points. The design checks loaded lowering performance, rigging height, tank opening, hook approaches and the complete clearance envelope.

Can two hoists lift one transformer together?

A coordinated arrangement can be engineered for approved two-point handling. Selection accounts for individual hook loads, spacing, centre of gravity, allowable height difference and fault response. Separate hoist ratings are not automatically additive.

Can you supply a crane for an existing transformer workshop?

Yes. We review the span, roof clearance, runway arrangement and production route, then provide crane reactions and interface data for the project’s structural assessment. The proposal identifies any required interface changes.

Is a standard overhead crane suitable above exposed windings?

The configuration must address the process cleanliness requirements. Lubrication containment, debris protection and cleaning access can be included. A general workshop crane is not automatically a certified cleanroom crane.

Do you supply cranes for factory loading or for one-time site unloading?

This supply scope covers permanent overhead and gantry cranes for manufacturing, repair and loading facilities. One-time unloading at a substation follows a separate site lifting and transport plan, which may use mobile cranes or specialist transfer equipment.

What is included in the crane package?

The base crane package comprises the structure, end carriages, trolley, lifting mechanism, hook and rope system, drives, controls and specified protection. Attachments, process options, runway equipment and site services are separately identified in the quotation.

What documents and support are supplied?

The delivery scope includes the agreed arrangement and interface information, inspection and test records, operating and maintenance instructions, electrical drawings and parts identification. Installation guidance, commissioning assistance, training and spares are identified by scope in the quotation.

Henan Mine Crane · Technical information reviewed: 2026

Technical data: Henan Mine Crane Product Selection Guide, printed pages 42 and 44. Project publications: Henan Mine Crane, power-industry automated handling report, July 2026; Konecranes, Hitachi Energy Ludvika transformer-factory order announcement, February 2026; Kino Cranes, Overhead Crane Price. Transformer lifting interfaces follow the equipment manufacturer’s drawings and handling instructions.

Get a Transformer Handling Crane Layout and Quote

Send a workshop sketch, the main component and finished-transformer weights, and the lifting-point drawing. Include the tanking height, destination and target commissioning date if available.

Henan Mine Crane will develop: a crane configuration and working layout, a load and hook schedule, defined process options, building interface information and an itemized quotation with delivery and service scope.


Request a Transformer Crane Quote